Bring documents together
Add a bill of materials or quantities and supplier quotations. Native text extraction and OCR turn uploaded documents into structured evidence.
A clearer way to review supplier quotations.
Compare supplier quotations against purchase requirements, trace discrepancies to their source, and keep review decisions connected to the evidence.
The problem
A supplier quotation can look complete while differing from the bill of materials in quantity, specification, coverage, or commercial terms. Procurement reviewers need to see both the discrepancy and the document evidence behind it.
The workflow
Add a bill of materials or quantities and supplier quotations. Native text extraction and OCR turn uploaded documents into structured evidence.
Review quantity, specification, arithmetic, and commercial discrepancies alongside their original page or spreadsheet cell.
Correct extracted values, record review decisions, rerun checks, and export the resulting comparison.
The intelligent system
Model adapters support Ollama, Gemini, and Meta. The model assists interpretation; parser coordinates and deterministic verification rules keep the review grounded in the uploaded material.
Engineering decisions
Original uploads, extraction snapshots, and correction overlays are separate. A correction can change the working interpretation while preserving the evidence it came from.
Structured inference can propose fields and document roles. Local checks verify cited source elements and literal excerpts; uncertain associations remain available for review.
Deterministic rules check scope, quantities, specifications, arithmetic, and terms. Incomplete or unreliable evidence can prevent a total from being treated as comparable.
SQLite transactions connect documents, verification runs, corrections, review decisions, and audit events. Fingerprints help detect stale review decisions.
Hackathon context
Presented at BUILD-OFF: Business Edition Hackathon during the IoT Conference Philippines and AI Philippine Expo in November 2026.
About the eventThe interesting engineering problem is keeping an uncertain interpretation connected to reliable source evidence throughout a review.